PM’S PACKAGE SCHEMES

DETAILED INFORMATION ON COMPLETION OF INCOMPLETE PROJECTS UNDER PM PACKAGE OF ARUNACHAL PRADESH (MONITORING FORMAT)

Sl No
Name of the Scheme and other details
Allocated Amount
Release of Fund
Expenditure
Physical Progress
Comments
Photos
During 07 – 08
To be released during 08-09
Upto Mar’ 08
During last part of 2nd Qtr
Uptodate Cim. Fin. Progress
At commencement
As on
1
2
3
4
5
6
7
8
9
10
11
12
A
STATE
1
C/o LT line in New GA complex at 1 Tawang (3 phase 5 wire line 4 Km)
7.17
7.17
7.17
100%
Progress Report submitted
Awaited
Awaited
2
Extension and improvement of LT distribution system at Lumla
13.23
13.23
13.23
100%
Progress Report submitted
Awaited
Awaited
3
Strengthening of 33 KV line from Jaswant Ghar to Baisaki across Sela to avoid frequent line fault due to snow deposit
1.55
1.55
1.55
100%
Progress Report submitted
Awaited
Awaited
4
C/o 33 KV switch yard at Elephant point for monitoring power towards Bomdila and Bhalukpong
2.16
2.16
2.16
100%
UC and Progress Report submitted
Submitted
5
C/o 11 KV switch yard at Kalaktang for distribution, monitoring and controlling of supply at Kalaktang
8.97
8.97
8.97
100%
Sumitted
Submitted
6
Providing 3 phase 5 wire line arounf Power Department Complex in New Bomdila
4.90
4.90
Awaited
Awaited
7
Modification and improvement of existing 33 KV Sub Station at Bhalukpong i/c distribution of pannel board, switch yard, etc
12.50
12.50
Awaited
Awaited
8
Extension of 11 KV line from Power House to newly constructed DC Bunglow and JNV at Seppa
18.22
18.22
18.22
18.22
100%
Completion Certificate and UC submitted
Submitted
9
Extension of 11 KV line from Chimpu to Holongi
8.96
8.96
8.96
100%
Awaited
Awaited
10
Providing and installation of 11/0.4 KV 2 x 250 KVA Sub Station at Doimukh township to share existing load
5.05
5.05
5.05
100%
Awaited
Awaited
11
Extension and improvement of line in and around Yingkiong
8.20
8.20
8.20
100%
UC and Progress Report submitted
Submitted
Submitted
12
C/o 33 KV line from Yingkiong to Mariyang i/c 11/33 KV Sub Station at Mariyang
98.07
98.07
98.07
100%
UC and Progress Report submitted
Submitted
13
C/o 11 KV line from Yatung to Hawai upto Latul Ph-1 (Yatong to Latul)
11.37
11.37
11.37
11.37
100%
Progress Report submitted
Submitted
14
C/o 33 KV line from Latul to Yasong via Hawai (Latul to Yasung)
132.13
132.13
132.13
132.13
100%
Progress Report submitted
Submitted
15
C/o HT Tower over river Noadihing at Namsai
20.00
20.00
20.00
20.00
100%
Progress Report submitted
Awaited
Awaited
16
System improvement in and around Changlang township
76.74
21.50
55.24
21.50
21.50
17
Extension of 11 KV line from Longlung to Govt. Degree College, 15 Changlang Manmao road
7.69
7.69
Awaited
Awaited
18
Providing and installation of 2 x 1.6 MVA 33/11 KV Sub Station at Deomali in 16 Tirap district
20.09
20.09
Awaited
Awaited
Sub Total of State
457.00
356.58
100.42
203.22
356.58
B
RIDF
1
33 KV Express line from Deomali to Khonsa
16.80
16.80
100%
Awaited
Awaited
Sub Total of RIDF
16.80
16.80
C
APDRP
1
Accelerated Power Development & Reforms Programmes in APEC-III, Miao. Estimated Cost Rs. 2361.00 lakhs
360.10
231.00
129.10
53.55
177.90
Work in progress
UC and Progress Report submitted
Awaited
Awaited
2
Accelerated Power Development & Reforms Programmes in APEC-II, Pasighat. Estimated Cost Rs. 1870.00 lakhs
346.00
223.00
123.00
1.00
276.10
Work in progress
UC and Progress report submitted
Submitted for Pkg-A & B
Submitted for Pkg-A & B
3
Accelerated Power Development & Reforms Programmes in APEC-IV, Dirang. Estimated Cost Rs. 1848.00 lakhs
233.80
150.00
83.80
40.89
140.89
Work in progress
UC and Progress Report submitted
Awaited
Awaited
4
Accelerated Power Development & Reforms Programmes in APEC-I, Naharlagun. Estimated Cost Rs. 2520.00 lakhs
344.00
220.89
123.11
230.00
Work in progress
UC and Progress Report submitted
Awaited
Awaited
Sub Total of APDRP
1283.90
824.89
459.01
0.00
95.44
824.89
D
NLCPR
1
C/o 33 KV Express line from 1 Tawang to Lumla 33/11 KV 2 x 1.6 MVA S/S at Lumla
62.17
62.17
2
C/o 33 KV DC line from Nirjuli to Itanagar (now 132 KV S/C line under revised proposal)
25.00
13.40
11.60
13.40
Awaited
Awaited
3
C/o 2 x 5 MVA, 33/11 KV S/S at Naharlagun
54.00
54.00
54.00
100%
Awaited
Awaited
4
C/o 132 KV Transmission line from Ziro to Along via Daporijo
577.00
577.00
Work in progress
Awaited
Awaited
5
C/o S/C 132 KV Transmission line from Along to Pasighat
319.00
319.00
Work in progress
Awaited
Awaited
6
C/o Kathalguri Deomali 220 KV Transmission line
320.00
320.00
Work in progress
Awaited
Awaited
7
C/o 11 KV Transmission line from Hawai to Kibithu via Mati Nallah MH Project
23.13
23.13
23.13
23.13
100%
Completion Certificate, Progress Report and UC submitted
Submitted
Sub Total of NLCPR
1380.30
90.53
1289.77
0.00
23.13
90.53
E
NEC
1
C/o 132 KV S/C Transmission line fro Hoj to Itanagar i/c 2 x 20 MVA SS at Itanagar
115.00
115.00
2
C/o 2 x 3.15 MVA, 33/11 KV S/S at Banderdewa
29.00
29.00
29.00
29.00
Awaited
Awaited
3
C/o 2 x 1.6 MVA, 33/11 KV S/S at Sagalee
15.00
15.00
15.00
100%
Awaited
Awaited
4
C/o 2 x 5 MVA, 33/11 KV S/S at Daporijo

19.00
19.00
Awaited
Awaited
Sub Total of NEC
178.00
44.00
134.00
0.00
29.00
44.00
Total
3316.00
1316.00
2000.00
0.00
350.79
1316.00