DETAILED INFORMATION ON COMPLETION OF INCOMPLETE PROJECTS UNDER PM PACKAGE OF ARUNACHAL PRADESH (MONITORING FORMAT)
Sl No
|
Name of the Scheme and other details
|
Allocated Amount
|
Release of Fund
|
Expenditure
|
Physical Progress
|
Comments
|
Photos
|
||||
During 07 – 08
|
To be released during 08-09
|
Upto Mar’ 08
|
During last part of 2nd Qtr
|
Uptodate Cim. Fin. Progress
|
At commencement
|
As on
|
|||||
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
11
|
12
|
A
|
STATE
|
||||||||||
1
|
C/o LT line in New GA complex at 1 Tawang (3 phase 5 wire line 4 Km)
|
7.17
|
7.17
|
–
|
–
|
–
|
7.17
|
100%
|
Progress Report submitted
|
Awaited
|
Awaited
|
2
|
Extension and improvement of LT distribution system at Lumla
|
13.23
|
13.23
|
–
|
–
|
–
|
13.23
|
100%
|
Progress Report submitted
|
Awaited
|
Awaited
|
3
|
Strengthening of 33 KV line from Jaswant Ghar to Baisaki across Sela to avoid frequent line fault due to snow deposit
|
1.55
|
1.55
|
–
|
–
|
–
|
1.55
|
100%
|
Progress Report submitted
|
Awaited
|
Awaited
|
4
|
C/o 33 KV switch yard at Elephant point for monitoring power towards Bomdila and Bhalukpong
|
2.16
|
2.16
|
–
|
–
|
–
|
2.16
|
100%
|
UC and Progress Report submitted
|
Submitted
|
|
5
|
C/o 11 KV switch yard at Kalaktang for distribution, monitoring and controlling of supply at Kalaktang
|
8.97
|
8.97
|
–
|
–
|
–
|
8.97
|
100%
|
Sumitted
|
Submitted
|
|
6
|
Providing 3 phase 5 wire line arounf Power Department Complex in New Bomdila
|
4.90
|
4.90
|
–
|
–
|
–
|
–
|
Awaited
|
Awaited
|
||
7
|
Modification and improvement of existing 33 KV Sub Station at Bhalukpong i/c distribution of pannel board, switch yard, etc
|
12.50
|
12.50
|
–
|
–
|
–
|
Awaited
|
Awaited
|
|||
8
|
Extension of 11 KV line from Power House to newly constructed DC Bunglow and JNV at Seppa
|
18.22
|
18.22
|
–
|
–
|
18.22
|
18.22
|
100%
|
Completion Certificate and UC submitted
|
Submitted
|
|
9
|
Extension of 11 KV line from Chimpu to Holongi
|
8.96
|
8.96
|
–
|
–
|
–
|
8.96
|
100%
|
–
|
Awaited
|
Awaited
|
10
|
Providing and installation of 11/0.4 KV 2 x 250 KVA Sub Station at Doimukh township to share existing load
|
5.05
|
5.05
|
–
|
–
|
–
|
5.05
|
100%
|
–
|
Awaited
|
Awaited
|
11
|
Extension and improvement of line in and around Yingkiong
|
8.20
|
8.20
|
–
|
–
|
–
|
8.20
|
100%
|
UC and Progress Report submitted
|
Submitted
|
Submitted
|
12
|
C/o 33 KV line from Yingkiong to Mariyang i/c 11/33 KV Sub Station at Mariyang
|
98.07
|
98.07
|
–
|
–
|
–
|
98.07
|
100%
|
UC and Progress Report submitted
|
Submitted
|
|
13
|
C/o 11 KV line from Yatung to Hawai upto Latul Ph-1 (Yatong to Latul)
|
11.37
|
11.37
|
–
|
11.37
|
11.37
|
100%
|
Progress Report submitted
|
Submitted
|
||
14
|
C/o 33 KV line from Latul to Yasong via Hawai (Latul to Yasung)
|
132.13
|
132.13
|
–
|
132.13
|
132.13
|
100%
|
Progress Report submitted
|
Submitted
|
||
15
|
C/o HT Tower over river Noadihing at Namsai
|
20.00
|
20.00
|
–
|
20.00
|
20.00
|
100%
|
Progress Report submitted
|
Awaited
|
Awaited
|
|
16
|
System improvement in and around Changlang township
|
76.74
|
21.50
|
55.24
|
–
|
21.50
|
21.50
|
||||
17
|
Extension of 11 KV line from Longlung to Govt. Degree College, 15 Changlang Manmao road
|
7.69
|
–
|
7.69
|
–
|
–
|
–
|
–
|
Awaited
|
Awaited
|
|
18
|
Providing and installation of 2 x 1.6 MVA 33/11 KV Sub Station at Deomali in 16 Tirap district
|
20.09
|
–
|
20.09
|
–
|
–
|
–
|
–
|
–
|
Awaited
|
Awaited
|
Sub Total of State
|
457.00
|
356.58
|
100.42
|
203.22
|
356.58
|
||||||
B
|
RIDF
|
||||||||||
1
|
33 KV Express line from Deomali to Khonsa
|
16.80
|
–
|
16.80
|
–
|
–
|
–
|
100%
|
–
|
Awaited
|
Awaited
|
Sub Total of RIDF
|
16.80
|
–
|
16.80
|
–
|
–
|
–
|
|||||
C
|
APDRP
|
||||||||||
1
|
Accelerated Power Development & Reforms Programmes in APEC-III, Miao. Estimated Cost Rs. 2361.00 lakhs
|
360.10
|
231.00
|
129.10
|
–
|
53.55
|
177.90
|
Work in progress
|
UC and Progress Report submitted
|
Awaited
|
Awaited
|
2
|
Accelerated Power Development & Reforms Programmes in APEC-II, Pasighat. Estimated Cost Rs. 1870.00 lakhs
|
346.00
|
223.00
|
123.00
|
–
|
1.00
|
276.10
|
Work in progress
|
UC and Progress report submitted
|
Submitted for Pkg-A & B
|
Submitted for Pkg-A & B
|
3
|
Accelerated Power Development & Reforms Programmes in APEC-IV, Dirang. Estimated Cost Rs. 1848.00 lakhs
|
233.80
|
150.00
|
83.80
|
–
|
40.89
|
140.89
|
Work in progress
|
UC and Progress Report submitted
|
Awaited
|
Awaited
|
4
|
Accelerated Power Development & Reforms Programmes in APEC-I, Naharlagun. Estimated Cost Rs. 2520.00 lakhs
|
344.00
|
220.89
|
123.11
|
–
|
–
|
230.00
|
Work in progress
|
UC and Progress Report submitted
|
Awaited
|
Awaited
|
Sub Total of APDRP
|
1283.90
|
824.89
|
459.01
|
0.00
|
95.44
|
824.89
|
|||||
D
|
NLCPR
|
||||||||||
1
|
C/o 33 KV Express line from 1 Tawang to Lumla 33/11 KV 2 x 1.6 MVA S/S at Lumla
|
62.17
|
–
|
62.17
|
–
|
–
|
–
|
–
|
–
|
–
|
|
2
|
C/o 33 KV DC line from Nirjuli to Itanagar (now 132 KV S/C line under revised proposal)
|
25.00
|
13.40
|
11.60
|
–
|
–
|
13.40
|
–
|
–
|
Awaited
|
Awaited
|
3
|
C/o 2 x 5 MVA, 33/11 KV S/S at Naharlagun
|
54.00
|
54.00
|
–
|
–
|
–
|
54.00
|
100%
|
–
|
Awaited
|
Awaited
|
4
|
C/o 132 KV Transmission line from Ziro to Along via Daporijo
|
577.00
|
–
|
577.00
|
–
|
–
|
Work in progress
|
–
|
Awaited
|
Awaited
|
|
5
|
C/o S/C 132 KV Transmission line from Along to Pasighat
|
319.00
|
–
|
319.00
|
–
|
–
|
Work in progress
|
–
|
Awaited
|
Awaited
|
|
6
|
C/o Kathalguri Deomali 220 KV Transmission line
|
320.00
|
–
|
320.00
|
–
|
–
|
Work in progress
|
–
|
Awaited
|
Awaited
|
|
7
|
C/o 11 KV Transmission line from Hawai to Kibithu via Mati Nallah MH Project
|
23.13
|
23.13
|
–
|
–
|
23.13
|
23.13
|
100%
|
Completion Certificate, Progress Report and UC submitted
|
Submitted
|
|
Sub Total of NLCPR
|
1380.30
|
90.53
|
1289.77
|
0.00
|
23.13
|
90.53
|
|||||
E
|
NEC
|
||||||||||
1
|
C/o 132 KV S/C Transmission line fro Hoj to Itanagar i/c 2 x 20 MVA SS at Itanagar
|
115.00
|
–
|
115.00
|
–
|
–
|
–
|
–
|
–
|
–
|
–
|
2
|
C/o 2 x 3.15 MVA, 33/11 KV S/S at Banderdewa
|
29.00
|
29.00
|
–
|
–
|
29.00
|
29.00
|
–
|
Awaited
|
Awaited
|
|
3
|
C/o 2 x 1.6 MVA, 33/11 KV S/S at Sagalee
|
15.00
|
15.00
|
–
|
–
|
–
|
15.00
|
100%
|
–
|
Awaited
|
Awaited
|
4
|
C/o 2 x 5 MVA, 33/11 KV S/S at Daporijo |
19.00
|
–
|
19.00
|
–
|
–
|
–
|
–
|
–
|
Awaited
|
Awaited
|
Sub Total of NEC
|
178.00
|
44.00
|
134.00
|
0.00
|
29.00
|
44.00
|
|||||
Total
|
3316.00
|
1316.00
|
2000.00
|
0.00
|
350.79
|
1316.00
|
|||||